Your plans in 3D

Request your free 3D model

If you have planning drawings, approved or in progress, we turn them into a simplified 3D model with an indicative estimate. You see the space and the likely budget before you decide on the next step.

Free 3D model and estimate. Site visit and discussion. No obligation.

Have these to hand

What we ask for

  • Planning decision notice, if you have it
  • Planning drawings from your architect
  • Building regulations drawings, if you have them
  • Structural calculations, if you have them

PDF, JPG or PNG, up to 10 files: 25 MB each and 75 MB in total. Please export CAD drawings (DWG or DXF) as PDF. You can add your files in step 3.

Your request

Five short steps.

Tell us about yourself (your name, email, phone number and the property postcode) and your planning, add your drawings, then review and send. You can go back to any step before you send.

  1. Step 1: About you
  2. Step 2: Your planning
  3. Step 3: Your drawings
  4. Step 4: Your model
  5. Step 5: Review and send
Step 1 of 5About you

So we know who to send the model to and how to reach you.

A UK number, so we can arrange the site visit.

For example N13 4JG. Kept with your request only.

What the project includes Choose all that apply.
Step 2 of 5Your planning

The planning record lets us check we are modelling the right scheme. All three are optional.

Planning status (optional)

Step 3 of 5Your drawings

The model is built from your drawings. Send what you have; the optional documents help us read the scheme more accurately.

Online upload is not available at the moment. Send your request without files and we will arrange how to receive your drawings.

Step 4 of 5Your model

Tell us what you would most like to see.

What would you like to see?
Would you like an indicative estimate with the model?
When are you hoping to start? (optional)

Up to 1,000 characters.

Step 5 of 5Review and send

Check the details before you send them. You can go back to any step.

Check your answers in the steps above before you send.

Free 3D model and estimate. Site visit and discussion. No obligation.

We reply within 3 to 5 days. No drawings yet? Get in touch instead.

What happens next

From your drawings to a model you can explore.

Each step builds on the one before. You decide whether to go further at every stage.

01

We check your documents

We read the decision notice and drawings, and confirm we have what we need. If anything is missing, we ask. We reply within 3 to 5 days.

02

We build the model

We prepare a simplified 3D model and an indicative estimate, with its assumptions and exclusions. It is not a quotation and not a guaranteed price.

03

We send you a link

You receive a private link to view your model and the estimate, on your phone or computer, in your own time.

04

Site visit and discussion

If you would like to go further, we visit the property to see the conditions for ourselves and talk through what the drawings need to resolve, the likely scope and the questions to settle before pricing.

The estimate is indicative. It sets out assumptions and exclusions and is not a guaranteed price.

Before you begin

A few useful clarifications.

Do I need planning permission first?

Start with the drawings you have. The estimate does not confirm planning permission or building regulations approval.

Read our guide: do you need planning permission for an extension?

Is the estimate a quotation?

No. An indicative budget sets out a range, assumptions and exclusions. An itemised quotation needs an agreed scope and specification.

What if I do not have drawings?

Our project budget guide is a useful starting point. Describe what you want to change, and the team can discuss the next step.

Essential features: always on. These support security, your choices and enquiry forms.

Helps us understand website use. We do not send the details you enter in enquiry forms through this component.

Cookie policy ยท Privacy policy